Specific Process Knowledge/Characterization/XRD/XRD SmartLab: Difference between revisions
Appearance
| Line 20: | Line 20: | ||
The measurement settings and results of the pre-acceptance test are described in this document, also found on the Cleanroom drive: | The measurement settings and results of the pre-acceptance test are described in this document, also found on the Cleanroom drive: | ||
[https://labmanager.dtu.dk/view_binary.php?fileId=5413|(FAT) Factory Acceptance Test] - requires login | *[https://labmanager.dtu.dk/view_binary.php?fileId=5413|(FAT) Factory Acceptance Test] - requires login | ||
The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here: [[:File:Inspection certificate.pdf]] | The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here: [[:File:Inspection certificate.pdf]] | ||