Jump to content

Specific Process Knowledge/Characterization/XRD/XRD SmartLab: Difference between revisions

Eves (talk | contribs)
No edit summary
Eves (talk | contribs)
No edit summary
Line 19: Line 19:


The measurement settings and results of the pre-acceptance test are described in this document, also found on the Cleanroom drive:
The measurement settings and results of the pre-acceptance test are described in this document, also found on the Cleanroom drive:
[file:///U:/Nlab/CleanroomDrive/_Equipment/XRD/SmartLab_Report_DTUv1.pdf|(FAT) Factory Acceptance Test]]  - requires login
[https://labmanager.dtu.dk/function.php?module=Machine&view=view&page_id=169|(FAT) Factory Acceptance Test]]  - requires login


<-- [[:File:SmartLab_Report_DTUv1.pdf]] -->  
<-- [[:File:SmartLab_Report_DTUv1.pdf]] -->