Jump to content

Specific Process Knowledge/Characterization/XRD/XRD SmartLab: Difference between revisions

Eves (talk | contribs)
Eves (talk | contribs)
No edit summary
Line 10: Line 10:
'''The user manual(s), user APV(s), technical information, and contact information can be found in LabManager:'''  
'''The user manual(s), user APV(s), technical information, and contact information can be found in LabManager:'''  


[http://labmanager.dtu.dk/function.php?module=Machine&view=view&mach=428 XRD SmartLab in LabManager]
[http://labmanager.dtu.dk/function.php?module=Machine&view=view&mach=428 XRD SmartLab in LabManager] - requires login




Line 19: Line 19:


The measurement settings and results of the pre-acceptance test are described in this document, also found on the Cleanroom drive:
The measurement settings and results of the pre-acceptance test are described in this document, also found on the Cleanroom drive:
[[:File:SmartLab_Report_DTUv1.pdf]]
[file:///U:/Nlab/CleanroomDrive/_Equipment/XRD/SmartLab_Report_DTUv1.pdf|(FAT) Factory Acceptance Test]]  - requires login
 
<-- [[:File:SmartLab_Report_DTUv1.pdf]] -->


The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here: [[:File:Inspection certificate.pdf]]
The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here: [[:File:Inspection certificate.pdf]]