Specific Process Knowledge/Thin film deposition/Deposition of Chromium: Difference between revisions

Reet (talk | contribs)
Reet (talk | contribs)
Line 60: Line 60:
*6x6" wafers
*6x6" wafers
|
|
*1x 2" wafer or
*4x 2" wafer or
*1x 4" wafers or
*1x 4" wafers or
*1x6" wafer or
*Several smaller pieces  
*Several smaller pieces  
*In theory up to 8" wafer (or 2x4" wafer) but uniformity will be bad
|
|
*1x6" wafers
*1x6" wafers
Line 130: Line 132:
| Takes approx. 20 min to pump down
| Takes approx. 20 min to pump down
| Takes approx. 1 hour to pump down
| Takes approx. 1 hour to pump down
|
| Takes approx. 20 min to pump down
|
|
| Takes approx. 5 min to pump down load lock and 6 min for transfer to processing chamber
| Takes approx. 5 min to pump down load lock and 6 min for transfer to processing chamber