Specific Process Knowledge/Thermal Process/A3 Phosphor Drive-in furnace: Difference between revisions

From LabAdviser
Pevo (talk | contribs)
No edit summary
Line 1: Line 1:
'''Feedback to this page''': '''[mailto:labadviser@danchip.dtu.dk?Subject=Feed%20back%20from%20page%20http://http://labadviser.danchip.dtu.dk/index.php/Specific_Process_Knowledge/Thermal_Process/A3_Phosphor_Drive-in_furnace click here]'''
'''Feedback to this page''': '''[mailto:thinfilm@danchip.dtu.dk?Subject=Feed%20back%20from%20page%20http://http://labadviser.danchip.dtu.dk/index.php/Specific_Process_Knowledge/Thermal_Process/A3_Phosphor_Drive-in_furnace click here]'''


==Phosphorus Drive-in furnace (A3)==
==Phosphorus Drive-in furnace (A3)==

Revision as of 12:38, 11 October 2013

Feedback to this page: click here

Phosphorus Drive-in furnace (A3)

A3 Phosphor Drive-in furnace. Positioned in cleanroom 2

The Phosphorus Drive-in furnace (A3) is a Tempress horizontal furnace for oxidation of silicon wafers, annealing of the grown oxide and drive-in of phosphorus after a pre-deposition. Phosphorus pre-deposition takes place in the Phosphorus Predep furnace (A4). The Phosphorus Drive-in furnace can also be used for drive-in of phosphorus which has been ion implanted.

The Phosphorus Drive-in furnace is the third furnace tube in the A-stack positioned in cleanroom 2. The A-stack together with the Gate Oxide furnace (C2) are the cleanest of all furnaces in the cleanroom. Please be aware of which substrates are allowed to enter this furnace. Check the cross contamination chart.

The user manual, quality control instruction and results, technical information and contact information can be found in LabManager:

Phosphorus Drive-in furnace (A3)

Process knowledge

Overview of the performance of the phosphorus drive-in furnace and some process related parameters

Purpose Drive-in of phosphor, oxidation of silicon and annealing of the oxide. Oxidation:
  • Dry
  • Wet: with torch (H2+O2)
Performance Film thickness
  • Dry SiO2: 50 Å to ~2000 Å (takes too long to make it thicker)
  • Wet SiO2: 50 Å to ~3 µm (takes too long to make it thicker)
Process parameter range Process Temperature
  • 800-1150 oC
Process pressure
  • 1 atm
Gasses on the system
  • O2, N2 and H2
Substrates Batch size
  • 1-30 4" wafer (or 2" wafers) per run
Substrate material allowed