Jump to content

Specific Process Knowledge/Lithography/Descum: Difference between revisions

Jehem (talk | contribs)
Jehem (talk | contribs)
Line 109: Line 109:


=Plasma Asher 4=
=Plasma Asher 4=
<span style="color:red">Coming soon</span>
==Process gas ratio for plasma asher 4 & 5==
[[File:PA_descum_single_v1.png|400px|thumb|Ashing amount and ashing rate when processing a single 100 mm wafer.|right]]
 
[[File:PA_descum_multi_v1.png|400px|thumb|Ashing amount and ashing rate when processing multiple 100 mm wafers. Test measured on the center of 3 wafers.|right]]
 
The user manual, risk assessment, and contact information can be found in [http://labmanager.dtu.dk/function.php?module=Machine&view=view&mach=530 LabManager] - '''requires login'''
 
Descum of AZ 5214E on 100 mm wafers. The descum process was tested for single substrates, as well as 3 substrates, placed vertically in the glass boat. For the 3 substrates only the center substrate was used for testing, the front and back wafers were used as dummy wafers.
 
{| class="wikitable"
|-
! Test setup !! Single substrate !! Center of 3 substrates
|-
! scope=row| Test results
| Ashing rate: 5.7 ±2.1 µm/min<br>Non-uniformity: 0.6 ±0.4% || Ashing rate: 3.8 ±1.6 µm/min<br>Non-uniformity: 0.4 ±0.2%
|-
! scope=row| Wafers
| 1 || 3
|-
! scope=row| Wafer size
| 100 mm || 100 mm
|-
! scope=row| Boat position
| Center of chamber || Center of chamber
|-
! scope=row| Test wafer position
| Center of boat || Center of boat
|-
! scope=row| Total gas flow rate
| 200 sccm || 200 sccm
|-
! scope=row| Gas mix ratio
| 50% N<sub>2</sub> || 50% N<sub>2</sub>
|-
! scope=row| Chamber pressure
| 1.3 mbar || 1.3 mbar
|-
! scope=row| Power
| 200 W || 200 W
|-
! scope=row| Test processing time
| Tested parameter || Tested parameter
|-
! scope=row| Test average temperature
| 33°C || 33°C
|}
 
<br clear="all" />


=Plasma Asher 5=
=Plasma Asher 5=
<span style="color:red">Coming soon</span>
<span style="color:red">Coming soon</span>