Jump to content

Specific Process Knowledge/Lithography/EBeamLithography/JEOLAlignment: Difference between revisions

Thope (talk | contribs)
Thope (talk | contribs)
Line 43: Line 43:
PATH FT01
PATH FT01
   ARRAY (-15000,2,30000)/(10000,2,20000)
   ARRAY (-15000,2,30000)/(10000,2,20000)
ASSIGN A(1) -> ((1,1))
ASSIGN A(1) -> ((*,*))


1: ARRAY (-4000,5,2000)/(4000,5,2000)
1: ARRAY (-4000,5,2000)/(4000,5,2000)