Specific Process Knowledge/Thermal Process/Storage and cleaning of wafer to the A, B, C and E stack furnaces: Difference between revisions
Appearance
No edit summary |
No edit summary |
||
| Line 2: | Line 2: | ||
==RCA cleaning of wafers for the A, B, C and E stack furnaces== | |||
====A1 | |||
====A1 furnace==== | |||
*All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed). | *All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed). | ||
*Before boron pre-deposition, the silicon carbide boat and boron source wafers have to be RCA cleaned. | *Before boron pre-deposition, the silicon carbide boat and boron source wafers have to be RCA cleaned. | ||
====A2 and A4 furnaces==== | |||
*All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed). | |||
==== | ====A3 furnaces==== | ||
*All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed). | *All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed). | ||
*Wafers from the A4 furnace can go directly into the furnace | |||
====A4 furnace==== | |||
*All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed). | |||
====B2, B3, B4, E2 and E3 furnaces (LPCVD furnaces)==== | ====B2, B3, B4, E2 and E3 furnaces (LPCVD furnaces)==== | ||
| Line 16: | Line 23: | ||
*Wafers from the A stack furnaces and the C1 furnace can go directly into the furnace. | *Wafers from the A stack furnaces and the C1 furnace can go directly into the furnace. | ||
*Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace. | *Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace. | ||
====C1 furnace==== | ====C1 furnace==== | ||
| Line 22: | Line 28: | ||
*Wafers from the A, B and E stack furnaces and from PECVD4 can go directly into the furnace. | *Wafers from the A, B and E stack furnaces and from PECVD4 can go directly into the furnace. | ||
*Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace. | *Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace. | ||
====C2 furnace==== | |||
*Dedicated for oxidation of III-V materials. More information can be found here: | |||
====C3 furnace==== | ====C3 furnace==== | ||
*New silicon wafers can go directly into the furnaces. | *New silicon wafers can go directly into the furnaces. | ||
*Wafers from the A, B and E stack furnaces and from | *Wafers from the A, B and E stack furnaces, from the C1 furnace and from Wafer Bonder 02 can go directly into the furnace. | ||
*Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace. | *Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace. | ||
*Wafer pieces are allowed in the furnace, if these have been RCA cleaned. | *Wafer pieces are allowed in the furnace, if these have been RCA cleaned. | ||
====C4 furnace==== | |||
* | |||
==Storage and transportation of wafers for the A, B, C and E stack furnaces== | |||
====RCA cleaned wafers==== | |||
*The wafers have to be stored in a dedicated blue or black "RCA transfer" box, until thy go into the furnace | |||
====New wafers==== | |||
*The wafers have to be stored in clean boxes, i.e. boxes have only contained new wafers (do NOT use boxes from the dressing are), or they can be stored in dedicated blue or black "wafer transfer" boxes. | |||
====Wafers from one furnace to another==== | |||
*The wafers have to be stored in dedicated blue or black "wafer transfer" boxes. | |||
Revision as of 15:09, 3 December 2019
Feedback to this page: click here
RCA cleaning of wafers for the A, B, C and E stack furnaces
A1 furnace
- All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed).
- Before boron pre-deposition, the silicon carbide boat and boron source wafers have to be RCA cleaned.
A2 and A4 furnaces
- All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed).
A3 furnaces
- All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed).
- Wafers from the A4 furnace can go directly into the furnace
A4 furnace
- All wafers have to be RCA cleaned, this includes both new and processed wafers. The wafers should be cleaned the same day as they are going into the furnace. Remember to RCA clean a test wafers and dummy wafers (if needed).
B2, B3, B4, E2 and E3 furnaces (LPCVD furnaces)
- New silicon wafers can go directly into the furnaces.
- Wafers from the A stack furnaces and the C1 furnace can go directly into the furnace.
- Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace.
C1 furnace
- New silicon wafers can go directly into the furnaces.
- Wafers from the A, B and E stack furnaces and from PECVD4 can go directly into the furnace.
- Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace.
C2 furnace
- Dedicated for oxidation of III-V materials. More information can be found here:
C3 furnace
- New silicon wafers can go directly into the furnaces.
- Wafers from the A, B and E stack furnaces, from the C1 furnace and from Wafer Bonder 02 can go directly into the furnace.
- Other processed wafers and quartz wafers have to be RCA cleaned. The wafers can be cleaned the day before they are going into the furnace.
- Wafer pieces are allowed in the furnace, if these have been RCA cleaned.
C4 furnace
Storage and transportation of wafers for the A, B, C and E stack furnaces
RCA cleaned wafers
- The wafers have to be stored in a dedicated blue or black "RCA transfer" box, until thy go into the furnace
New wafers
- The wafers have to be stored in clean boxes, i.e. boxes have only contained new wafers (do NOT use boxes from the dressing are), or they can be stored in dedicated blue or black "wafer transfer" boxes.
Wafers from one furnace to another
- The wafers have to be stored in dedicated blue or black "wafer transfer" boxes.