Jump to content

Specific Process Knowledge/Thin film deposition/Temescal: Difference between revisions

Reet (talk | contribs)
Reet (talk | contribs)
Line 118: Line 118:
==Quality control (QC) for the Temescal==
==Quality control (QC) for the Temescal==


We are still developing the QC procedure for the Temescal (July 2018).
We are still developing the QC procedure for the Temescal (September 2018).


==Other stuff to add [[Image:section under construction.jpg|70px]]==
==Other stuff to add [[Image:section under construction.jpg|70px]]==