Specific Process Knowledge/Bonding/Fusion bonding: Difference between revisions
Appearance
No edit summary |
No edit summary |
||
| Line 19: | Line 19: | ||
*Place the chuck and graphite electrode in the chamber. | *Place the chuck and graphite electrode in the chamber. | ||
*Close the chamber. | *Close the chamber. | ||
*Turn the µm screw on top of the chamber to set the desired stack | *Turn the µm screw on top of the chamber to set the desired stack height. | ||