Specific Process Knowledge/Thermal Process/Dope with Boron: Difference between revisions
Appearance
No edit summary |
|||
| Line 9: | Line 9: | ||
All this figures have been made at the time where there was a furnace only for Boron Pre-dep (furnace A2). The process was done with the temperature at 1125 <sup>o</sup>C and a flow of 5 slm N<sub>2</sub> and 0.2 slm of O<sub>2</sub>. | All this figures have been made at the time where there was a furnace only for Boron Pre-dep (furnace A2). The process was done with the temperature at 1125 <sup>o</sup>C and a flow of 5 slm N<sub>2</sub> and 0.2 slm of O<sub>2</sub>. | ||
<gallery caption="Boron profiles from SIMS " widths="400px" heights="300px" perrow="3"> | <gallery caption="Boron profiles from SIMS " widths="400px" heights="300px" perrow="3"> | ||
image:borprofil_1tim.jpg|1 hour | image:borprofil_1tim.jpg|Pre-depostion time at 1125 °C 1 hour | ||
image:borprofil_6tim.jpg|6 hours | image:borprofil_6tim.jpg|6 hours | ||
image:borprofil_16tim.jpg|16 hours | image:borprofil_16tim.jpg|16 hours | ||