Jump to content

Specific Process Knowledge/Thermal Process/Dope with Boron: Difference between revisions

Mdyma (talk | contribs)
Kabi (talk | contribs)
No edit summary
Line 8: Line 8:


All this figures have been made at the time where there was a furnace only for Boron Pre-dep (furnace A2). The process was done with the temperature at 1125 <sup>o</sup>C and a flow of 5 slm N<sub>2</sub> and 0.2 slm of O<sub>2</sub>.  
All this figures have been made at the time where there was a furnace only for Boron Pre-dep (furnace A2). The process was done with the temperature at 1125 <sup>o</sup>C and a flow of 5 slm N<sub>2</sub> and 0.2 slm of O<sub>2</sub>.  
<gallery caption="Boron profiles from SIMS " widths="200px" heights="200px" perrow="3">
<gallery caption="Boron profiles from SIMS " widths="400px" heights="300px" perrow="3">
image:borprofil_1tim.jpg|1 hour
image:borprofil_1tim.jpg|1 hour
image:borprofil_6tim.jpg|6 hours
image:borprofil_6tim.jpg|6 hours
image:borprofil_16tim.jpg|16 hours
image:borprofil_16tim.jpg|16 hours
</gallery>
</gallery>
<gallery caption="Boron profiles from SIMS " widths="200px" heights="200px" perrow="3">
<gallery caption="Boron deffusion depth vs. pre-deposition time" widths="400px" heights="300px" perrow="3">
image:borDiffusionDepthtable.jpg
image:borDiffusionDepthtable.jpg
image:borDiffusionDepthplot.jpg
image:B_Diff_depth_vs_time.jpg
<!--image:borDiffusionDepthplot.jpg -->