Specific Process Knowledge/Lithography/Development/Developer TMAH UV-lithography processing: Difference between revisions
Appearance
| Line 35: | Line 35: | ||
After development, the substrate is rinsed using DI water, and dried using nitrogen. | After development, the substrate is rinsed using DI water, and dried using nitrogen. | ||
The standard rinse and dry procedure is 30s at | The standard rinse and dry procedure is 30s at 4000 rpm with DIW being administered from the top at the center of the substrate, followed by a 10-15s dry at 3000 rpm using nitrogen from the top at the center of the substrate. The top side rinse is at a rate of approximately 500 ml/min, corresponding to 250 ml DIW during the rinse. The flow rate of the nitrogen is 50 l/min, and the drying time is set according to the size of the substrate. | ||
=Standard Processes= | =Standard Processes= | ||