Jump to content

Specific Process Knowledge/Wafer cleaning: Difference between revisions

Kabi (talk | contribs)
Kabi (talk | contribs)
Line 42: Line 42:
|Mandatory prior furnace processes  
|Mandatory prior furnace processes  
|When needed and always after KOH etch and Nitride etch in Phosphoric acid
|When needed and always after KOH etch and Nitride etch in Phosphoric acid
|Optional with RCA cleaning  
|Optional during RCA cleaning
|Cleaning before wafer bonding  
|Cleaning before wafer bonding  
|Cleaning very dirty items that enters the cleanroom. Should be followed by a piranha clean.
|Cleaning very dirty items that enters the cleanroom. Should be followed by a piranha clean.