Jump to content

Specific Process Knowledge/Thin film deposition/Lesker: Difference between revisions

Jehan (talk | contribs)
mNo edit summary
Knil (talk | contribs)
Line 8: Line 8:


Lift off should never be done in the normal lift off bath in RR4 it should always be done in the dedicated lift off bath opposite the sputter.
Lift off should never be done in the normal lift off bath in RR4 it should always be done in the dedicated lift off bath opposite the sputter.
'''The user manual, user APV and contact information can be found in LabManager:'''
<!-- remember to remove the type of documents that are not present -->
<!-- give the link to the equipment info page in LabManager: -->
[http://labmanager.danchip.dtu.dk/function.php?module=Machine&view=view&mach=244  Sputter-System(Lesker) in LabManager]




Line 19: Line 26:


Contact the pvd-group if you have special needs (pvd@danchip.dtu.dk).
Contact the pvd-group if you have special needs (pvd@danchip.dtu.dk).


==Overview of the performance of Sputter-System(Lesker) and some process related parameters==
==Overview of the performance of Sputter-System(Lesker) and some process related parameters==