Specific Process Knowledge/Thin film deposition/Lesker: Difference between revisions
Appearance
mNo edit summary |
|||
| Line 8: | Line 8: | ||
Lift off should never be done in the normal lift off bath in RR4 it should always be done in the dedicated lift off bath opposite the sputter. | Lift off should never be done in the normal lift off bath in RR4 it should always be done in the dedicated lift off bath opposite the sputter. | ||
'''The user manual, user APV and contact information can be found in LabManager:''' | |||
<!-- remember to remove the type of documents that are not present --> | |||
<!-- give the link to the equipment info page in LabManager: --> | |||
[http://labmanager.danchip.dtu.dk/function.php?module=Machine&view=view&mach=244 Sputter-System(Lesker) in LabManager] | |||
| Line 19: | Line 26: | ||
Contact the pvd-group if you have special needs (pvd@danchip.dtu.dk). | Contact the pvd-group if you have special needs (pvd@danchip.dtu.dk). | ||
==Overview of the performance of Sputter-System(Lesker) and some process related parameters== | ==Overview of the performance of Sputter-System(Lesker) and some process related parameters== | ||