Jump to content

Specific Process Knowledge/Characterization/XRD/XRD SmartLab 9kW Rotating Anode: Difference between revisions

Eves (talk | contribs)
Eves (talk | contribs)
Line 18: Line 18:
The measurement settings and results of the pre-acceptance test are described in this document, also found on the Lab Manager:
The measurement settings and results of the pre-acceptance test are described in this document, also found on the Lab Manager:


*[https://labmanager.dtu.dk/view_binary.php?class=MiscDocument&id=3&name=FAT_XRD_RotAnode_DTU-RigakuXRD-Report.pdf |(FAT) Factory Acceptance Test]  - requires login
*[https://labmanager.dtu.dk/view_binary.php?class=MiscDocument&id=3&name=FAT_XRD_RotAnode_DTU-RigakuXRD-Report.pdf|(FAT) Factory Acceptance Test]  - requires login


The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here:  
The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here:  


*[https://labmanager.dtu.dk/view_binary.php?class=MiscDocument&id=3&name=Inspection_Certificate_XRD_RotAnode_2024.pdf |(SAT) Site Acceptance Test]  - requires login
*[https://labmanager.dtu.dk/view_binary.php?class=MiscDocument&id=3&name=Inspection_Certificate_XRD_RotAnode_2024.pdf|(SAT) Site Acceptance Test]  - requires login