Jump to content

Specific Process Knowledge/Thin film deposition/Temescal: Difference between revisions

Reet (talk | contribs)
Reet (talk | contribs)
Line 172: Line 172:
==Quality control (QC) for the Temescal==
==Quality control (QC) for the Temescal==


We are still developing the QC procedure for the Temescal (September 2018).
We are still developing the QC procedure for the Temescal (December 2018).