Jump to content

Specific Process Knowledge/Thermal Process/A1 Bor Drive-in furnace: Difference between revisions

BGE (talk | contribs)
BGE (talk | contribs)
Line 49: Line 49:
*Silicon wafers (new from the box or RCA cleaned)
*Silicon wafers (new from the box or RCA cleaned)
*From A2 furnace directly (e.g. incl. Predep HF)
*From A2 furnace directly (e.g. incl. Predep HF)
*In doubt: look at the cross contamination sheet or ask one from the furnace team
|-  
|-  
|}
|}