Jump to content

Specific Process Knowledge/Lithography/Strip: Difference between revisions

Taran (talk | contribs)
Taran (talk | contribs)
Line 225: Line 225:
The other materials have not been tested yet.
The other materials have not been tested yet.


=III-V Plasma Asher =
=III-V Plasma Asher=
 
[[Image:III-V_asher.jpg|300x300px|thumb|Plasma asher for removing AZ resist on III-V samples: positioned in A-5]]


=Acetone Strip=
=Acetone Strip=