Specific Process Knowledge/Etch/DRIE-Pegasus/showerheadchange/polySi/Cduv: Difference between revisions

From LabAdviser
Jmli (talk | contribs)
Created page with " {| border="2" cellpadding="0" cellspacing="0" style="text-align:center;" |+ '''Process runs''' |- ! rowspan="2" width="40"| Date ! colspan="4" width="120"| Substrate Informat..."
 
Jmli (talk | contribs)
No edit summary
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
<!--Page reviewed by jmli 9/8-2022  -->


{| border="2" cellpadding="0" cellspacing="0" style="text-align:center;"
{| border="2" cellpadding="0" cellspacing="0" style="text-align:center;"
Line 17: Line 19:
! width="40" | Comments
! width="40" | Comments
|-
|-
| 4/9-2014
| 20/11-2014
| 1/4 6" ELK stitching CB on oxide carrier
| 6" Wafer with 210 nm oxide and 1800 nm polysilicon
| standard stepper mask (50 nm barc + 320 nm krf)
| standard stepper mask (50 nm barc + 320 nm krf)
| Si / 50+ % on die
| Si / 50+ %  
| Pegasus/jmli
| Pegasus/jmli
| 5 minute TDESC clean + 30 sec barc etch
| 10 minute TDESC clean + 45 sec barc etch
| jml/polySi/lshbaseline-A: 50 cycles or 6:15 minutes  
| nanolab/jml/showerhead/polySi etch DUV mask, 20 cycles or 3:02 minutes  
| S004301
| S004675
! Old showerhead
|  
|  
[[file:S00459305.jpg|150px|frameless ]]
[[file:S00459306.jpg|150px|frameless ]]
[[file:S00459307.jpg|150px|frameless ]]
[[file:S00459308.jpg|150px|frameless ]]
[[file:s004593-01.jpg|150px|frameless ]]
[[file:s004593-02.jpg|150px|frameless ]]
[[file:s004593-03.jpg|150px|frameless ]]
|-
| 1/12-2014
| 1/4 6" Wafer with 210 nm oxide and 1800 nm polysilicon crystalbonded on carrier
| standard stepper mask (50 nm barc + 320 nm krf)
| Si / 50+ %
| Pegasus/jmli
| 10 minute TDESC clean + 45 sec barc etch
| nanolab/jml/showerhead/polySi etch DUV mask, 20 cycles or 3:02 minutes
| S004675
! New showerhead
|  
|  
[[file:Peg-S004301-03.jpg |120px|frameless ]]
 
[[file:Peg-S004301-04.jpg |120px|frameless ]]
[[file:Peg-S004301-05.jpg |120px|frameless ]]
[[file:Peg-S004301-06.jpg |120px|frameless ]]
[[file:Peg-S004301-01.jpg |120px|frameless ]]
[[file:Peg-S004301-02.jpg |120px|frameless ]]
|-
|-
|}
|}

Latest revision as of 10:12, 9 August 2022


Process runs
Date Substrate Information Process Information SEM Images
Wafer info Mask Material/ Exposed area Tool / Operator Conditioning Recipe Wafer ID Comments
20/11-2014 6" Wafer with 210 nm oxide and 1800 nm polysilicon standard stepper mask (50 nm barc + 320 nm krf) Si / 50+ % Pegasus/jmli 10 minute TDESC clean + 45 sec barc etch nanolab/jml/showerhead/polySi etch DUV mask, 20 cycles or 3:02 minutes S004675 Old showerhead

1/12-2014 1/4 6" Wafer with 210 nm oxide and 1800 nm polysilicon crystalbonded on carrier standard stepper mask (50 nm barc + 320 nm krf) Si / 50+ % Pegasus/jmli 10 minute TDESC clean + 45 sec barc etch nanolab/jml/showerhead/polySi etch DUV mask, 20 cycles or 3:02 minutes S004675 New showerhead