Specific Process Knowledge/Etch/DRIE-Pegasus/System-description

From LabAdviser
Revision as of 12:15, 28 April 2023 by Jmli (talk | contribs) (→‎The Claritas endpoint system)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Feedback to this page: click here


Description of the Bosch process at the DRIE-Pegasus

Unless otherwise stated, all content on this page was created by Jonas Michael-Lindhard, DTU Nanolab

This section applies to all Pegasus tools. For Pegasus 4, however, it is less important as dielectrics etches are continuous.

The DRIE-Pegasus tools take the well established Bosch process known from the ASE a significant step further. In the ASE the Bosch process has two cycles, etch and passivation. During each cycle the process parameters are kept constant:

  • In the passivation cycle, a C4F8 plasma is formed using the RF coil power only and a teflon-like coating is created on all surfaces thus protecting the sidewalls in the subsequent etch cycle.
  • In the etch cycle
    • the ion bombardment driven by the platen power first removes the passivation layer on the surfaces directly exposed to the ions (i.e. horizontal surfaces)
    • then as the bottom of the structures are opened the etch of silicon itself starts.
The etch cycle may be split into three parts, Boost, Delay and Main, where process parameters such as pressure, gas flows or RF powers have different values. The red curve shows the possible characteristics of the platen power. Image: DTU Nanolab internal

Here, it is clear that one can distinguish two phases of the etch cycle; one where the ion bombardment removes the polymer and one where the actual etching of silicon takes place. Considering what process conditions are favorable we realize that

  1. the ion bombardment requires a low pressure in order for the ions to have a long mean free path and hence good directionality. Also, a high platen power is required to drive the ion bombardment.
  2. a higher pressure during the etch increases the density of reactive species and hence the etch rate. Since a high platen power is no longer necessary to drive the ion bombardement, lowering it will reduce the impact on the masking material thus improving the selectivity.

These conflicting demands are the same on the ASE. However, with hardware improvements on the DRIE-Pegasus tools such as

  • fast response digtal MFC's mounted on top of the process chamber itself to shorten the gas line
  • fast APC valve
  • fast RF power supplies

the etch and deposition cycles may be split into three separate phases, labelled Delay, Boost and Main. Following the arguments from above, the third phase (Delay) may be thought of as a short delay that ensures a very low pressure (and thus extremely good ion directionality) before the ion bombardment. The standard etches on the Pegasus only make use of up to two phases.

Processing options on the Pegasus

This section applies to all Pegasus tools.

The Pegasus has a lot of advanced processing options.

  1. Multiplexing: As described above, the multiplexed Bosch process may have the etch or passivation cycle each split into three separate phases: Delay, Boost and Main. The duration of each individual phase (delay, boost and main) for each individual process parameter (pressure, gases and RF generators) may be given any value thus enabling the phases to run asynchronously. This gives an infinite process parameter space...
  2. Ramping:Using the ramp option one can change process parameters linearly over the course of each processing step.
  3. Process steps: Stich any number of processing steps with different parameters to make one continuous process.
  4. Hardware: The Pegasus has several hardware settings that can be changed - you will, however, need a very strong argument to come through with a request for such a changed as it will also change processing conditions for all other processes.
    1. Spacers : The distance to the plasma source may be changed by using different spacers.
    2. Baffle and funnel: The funnel inside the chamber helps to focus the plasma/ions towards the electrode. They may be taken out but don't expect this option to be part of the parameters that you can change in your experiments.

Modification of the showerhead

This section applies to all Pegasus tools.

It is clear that optimizing the Bosch processes on the Pegasus can be done in countless ways. Reducing the cycle time is a very convenient way of getting rid of, or at least reducing, scallops. The faster the process switches the smaller the scallops will be. However, at some point the hardware (MFS's, RF generators, APC valve) cannot keep up with the demand and the process will essentially be continuous causing the Bosch process to break down. In its original setup, the Pegasus had standard processes with cycle durations down to 2 seconds. The hardware on the Pegasus is indeed very fast and allows faster switching. The limiting factor in the Bosch process was identified by Henri Jansen - and we have taken steps to improve this as described below.

In the top of the plasma source sits a showerhead that is intended to distribute the process gasses uniformly so that a uniform etch process is achieved. However, calculations showed that the resistance imposed on the gasses flowing through small holes caused by small holes in the showerhead. The showerhead that distributes the process gasses inside the plasma source has been changed. With the new design the gas flow resistance in the gas line from MFC to plasma has been reduced. This has very little or no impact on processes that have a continuous gas flow - i.e. processes that are not switched. However, for processes with several gas flows that switch on and off, the switching from one gas flow to another will be much more well defined. This enables us to run Bosch processes with shorter cycles times. Shorter cycles times means smaller scallops and hence lower roughness and better control.

As stated, we believe that only switched processes will be affected by this change. Continuous processes such as Process C, Nano1.42, isotropic etches, barc etches or the black silicon recipes are not believed to be noticeably affected.

Click HERE to see a comparison of some the etches before and after the change of the showerhead.

RF Matching

RF matching in general

(This section contains material from the Dry Etch TPT lecture)

Connecting a RF generator to an AC circuit in order to drive a plasma in a dry etch tool is not as trivial as one might expect. One cannot just connect an RF generator to a coil, put a certain power through and expect that a plasma generated will automatically absorb all energy. It is not possible: At RF frequencies cables become inductors so circuits must be carefully constructed.

Most RF power generators are designed to transfer power into a 50 ohm load. This means that the circuit, in addition to the coil that has a certain inductance and resistance will also require additional electrical components if the total 50 ohm impedance criteria is to be met (unless the inductance and resistance of the coil are carefully chosen and constant). If the impedance is off, part of the power will be dissipated elsewhere in the circuit as reflected power - for instance as localized heating of RF cables due to standing waves. One must therefore have a way of controlling the circuit impedance.

The matching unit consists of two tunable capacitors and an impedance matching network. The network measures the impedance of the circuit and automatically adjusts the capacitances of the two capacitors (called Load and Tune, one connected in serial, the other in parallel) in order to match the 50 ohm impedance. The adjustment of the capacitance is accomplished by changing of the active area inside the capacitor - the shaft rotates one part of the capacitor as illustrated above. In all recipes, one has to provide setpoints for the Load and Tune. If chosen correctly, then once the plasma ignites the matching network will then adjust automatically to achieve RF matching.

It is unrealistic to achieve perfect matching (zero reflected power) so some minimum value (always less than 10 % of the input power) is found. This is, however, by no means a simple matter and the setpoints of Load and Tune (always measured as percentages of full capacitance) must be chosen wisely or the RF matching will fail. Therefore, if the setpoints for Load and Tune in a recipe are wrong - the process will fail and most likely abort.

Once a plasma has been ignited in the process chamber by the coil, an electron current will be induced in the conductive part of the plasma so as to oppose the RF magnetic field. As a result of the coupling between the coil and the plasma, the inductance of the coil changes. This, in turn, changes the impedance of the generator circuit and the matching network ensures that the impedance matching is still preserved.

Why RF matching is extremely important in the Bosch process

In the continuous processes (that means fixed parameters that do not change during the process) that are used in most dry etch tools the action of the impedance matching network is mostly seen in the beginning of the process when the plasma stabilizes. Once stabilized and a minimum reflected power has been established, the capacitors usually needs only minor adjustments. Below is a datalog of an oxygen cleaning process running with:

  • 100 sccm O2
  • 1200 W coil power
  • 20 W platen power
  • Automatic matching

showing the values of the Load (blue) and Tune (red) positions. The only process parameter that changes is the pressure - along the X axis one can see the different pressure settings.

  • In the left side of the image before it says 5 mTorr, the capacitors are at the setpoint values and there is no adjustment. Once the plasma ignites (when the pressure setting changes to 5 mTorr), the capacitors respond in a typical fashion to find a minimum of reflected power. Once this is done (usually in a matter of a few seconds), they change only little.
  • When the pressure changes (the point on the X axis where the 10 mTorr regime starts), the matching network responds and settles into new positions with a minimum power. SPTS labels this a 'sweet spot'.
  • The positions of Load and Tune change as the pressure is gradually increased to 90 mTorr. The change is, in fact, very significant compared to when changes in other process parameters (such as power, gas flow or temperature) are varied during processing in a similar experiment.

What happens in a Bosch process where the plasma conditions change every few seconds?

The situation during a Bosch process as described in the top of this page is very different from the continuous process with respect to RF matching. Here,

  • the pressure
  • the gas flow
  • the gas composition
  • the RF powers

are changed every few seconds - hence requiring the capacitors to adjust to an entirely new situation. In other words, if not carefully tuned, the Bosch process will spend most of the time stabilizing the plasma.

The Picoscope

The process monitoring on Pegasus 1, 2 and 3 has been dramatically improved with the installation of the Picoscope. Click HERE to access a page on the Picoscope only.

The Claritas endpoint system

This section applies to Pegasus 1. Too bad that it is empty so far...