Specific Process Knowledge/Characterization/XRD/XRD SmartLab 9kW Rotating Anode: Difference between revisions

From LabAdviser
Eves (talk | contribs)
Eves (talk | contribs)
Line 18: Line 18:
The measurement settings and results of the pre-acceptance test are described in this document, also found on the Lab Manager:
The measurement settings and results of the pre-acceptance test are described in this document, also found on the Lab Manager:


* [[https://labmanager.dtu.dk/view_binary.php?class=MiscDocument&id=3&name=FAT_XRD_RotAnode_DTU-RigakuXRD-Report.pdf]|(FAT) Factory Acceptance Test] - requires login
* [https://labmanager.dtu.dk/view_binary.php?class=MiscDocument&id=3&name=FAT_XRD_RotAnode_DTU-RigakuXRD-Report.pdf]|(FAT) Factory Acceptance Test  - requires login


The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here:  
The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here:  


* [https://labmanager.dtu.dk/view_binary.php?class=MiscDocument&id=3&name=Inspection_Certificate_XRD_RotAnode_2024.pdf |(SAT) Site Acceptance Test]  - requires login
* [https://labmanager.dtu.dk/view_binary.php?class=MiscDocument&id=3&name=Inspection_Certificate_XRD_RotAnode_2024.pdf |(SAT) Site Acceptance Test]  - requires login

Revision as of 17:26, 9 October 2024

XRD SmartLab

The Rigaku 9kW Rotating Anode XRD SmartLab is an advanced XRD instrument for measuring thin films, powders, and other substances. All thin films can be measured without fixating the sample, as the system has a so called In-Plane arm.

The XRD SmartLab located in a basement 346-904


The user manual(s), user APV(s), technical information, and contact information can be found in LabManager:

XRD RotAnode SmartLab in LabManager - requires login


Various measurement types including X-Ray reflectivity, Rocking curve, Theta-2theta, and Pole figures are described here:

Process information


The measurement settings and results of the pre-acceptance test are described in this document, also found on the Lab Manager:

  • [1]|(FAT) Factory Acceptance Test - requires login

The same measurement were completed as part of the acceptance, but no report was generated. In addition the inspection certificate is available here: