November 2012 Survey: Difference between revisions

From LabAdviser
Fj (talk | contribs)
No edit summary
Fj (talk | contribs)
No edit summary
Line 63: Line 63:
<h5> Furnace: LPCVD Nitrid has been out of use for a long time. This has slowed me in my work on my BSc project. Also the PECVD1 had missing B2H6 MFC, which also was an obstacle for me. The SSE Spinner is always booked, because everyone needs to use it - Danchip should consider to buy one more Spinner.</h5>
<h5> Furnace: LPCVD Nitrid has been out of use for a long time. This has slowed me in my work on my BSc project. Also the PECVD1 had missing B2H6 MFC, which also was an obstacle for me. The SSE Spinner is always booked, because everyone needs to use it - Danchip should consider to buy one more Spinner.</h5>


<i> Action: We assume that the comment is on the LPCVD Nitride(6"). We have had severe problems with condensation of DCS in the line which a.o. destroyed the mfc and in the end resulted in a severe particle contamination of the furnace. The repair work has been delayed partly due to long delivery times on spare parts. In such a case where we must foresee a long down time we normally would try to find an alternative in-house solution or assist on finding an external source. I do not know if the user in the present case was made aware of this. Regarding the B2H6 problem on PECVD1 the issue seems to be decoposition of the gas resulting in a "sticky" layer deposited on the inside of the tube and other components on the gas line (pressure gauge/regulator, mfc). Again the problem/solution has been very complex and a.o. implied waiting times for spare parts. As part of the problem was in the gas supply it was not possible to find an in-house alternative and the only external supplier that we could find had similar problems and was not able to help. xxx</i> <br>
<i> Action: We assume that the comment is on the LPCVD Nitride(6"). We have had severe problems with condensation of DCS in the line which a.o. destroyed the mfc and in the end resulted in a severe particle contamination of the furnace. The repair work has been delayed partly due to long delivery times on spare parts. In such a case where we must foresee a long down time we normally would try to find an alternative in-house solution or assist on finding an external source. I do not know if the user in the present case was made aware of this. Regarding the B2H6 problem on PECVD1 the issue seems to be decoposition of the gas resulting in a "sticky" layer deposited on the inside of the tube and other components on the gas line (pressure gauge/regulator, mfc). Again the problem/solution has been very complex and a.o. implied waiting times for spare parts. As part of the problem was in the gas supply it was not possible to find an in-house alternative and the only external supplier that we could find had similar problems and was not able to help. Regarding spinner capacity a double-track spinner system from SVG is being installed now.xxx</i> <br>


<br>
<br>

Revision as of 16:06, 21 January 2013

Survey introduction

The November 2012 survey was the eights survey carried out using a format where individual cleanroom users were asked about their view on various parts of using DTU Danchip's facilities and in particular the cleanroom facilities.
The questionaire was send to 283 registered users (based on the logging of cleanroom use) unfortunately 8 of the e-mail adresses was obsolete and thus the mails bounced, which brought the total number of potential answers to 275 . In total 64 persons answered the questionaire which means an answer fraction of 23% regardless of whether or not the bounces should be included in the total.
This page deals with the comments given as part of the questionaire. Danchip values this feedback highly.

Comments

The comments appear here as they were written in the feedback field of the questionaire. In a few cases they have been anonymized or the worst spelling mistakes corrected.

Comment 1

All invoices for DPC are coming on my name, since I have made the agreement, and it is very difficult to understand from the invoice for what the money is taken. Please specify it correctly: name of the person, number of samples, kind of analyses.

Action: Overhaul of sponsor structure

We will make an effort in 2013 to align all LabManager groups with the project structures from the various departments.


Comment 2

The paying scheme is a bit of a mess and, since we are constantly applying for funds, not knowing how much to ask for cleanroom expenses (that are a big part of the expenses) is not the best.

Action: New price and payment structure

Hopefully this is a thing of the past since we have now a much simpler price and payment structure.



Comment 3

Our shelves are still at the characterization area. Could they be removed to the old place one day? That would be easier because one always has to go a long way to the samples when working in the "old" cleanroom. The new shelves for shoes are very good. Could you consider having a wardrobe for sweaters as well?.

Action: xxx


Comment 4

Having to wait 2 days for a request for training in some equipment, is too long in my opinion.

Action: No action

We appreciate that waiting is always undesireable. However, with the multitude of tools at Danchip and the complexity of some training requests in mind, there are times where we even find it hard to respond within two days.


Comment 5

I haven't answered very satisfied to all as there are always reasonable problems, e.g. someone else is using the equipment, hence making it unavialable, or maintainance. But these things are to be expected anyway. I'm happy with how people from Danchip are very helpful. Responses are not always as early as desired, but it is understandable.

Action: xxx


Comment 6

Special discount agreement for DTU physics have helped my project a lot.

Action: xxx


Comment 7

Satisfied overall. One issue is that some of the equipments seems lack of maintenance and always get problems (III-V ICP for example) which delays the works.

Action: Regarding the III-V ICP, we had a severe gas incident in the gas box of the tool (condesating BCl3 which due to high pressure resulted in back-streaming to the nitrogen line in the gas-box). The root-cause analysis of the problem was very complicated as well as the actual repair which a.o. implicated waiting for spare parts with a long delivery time. For this work the machine was out of service for 6 weeks of which 1 week was a yearly service from SPTS (according to service contract). Moreover, we had to find a fundamentally different solution on the heat-tracing of the BCl3 gas-line (the main problem) which is still on-going. We are of course not happy about a situation where a tool is down for 6 weeks but this particular problem contained several severe obstacles (also safety related!) which called for new solutions. Regarding the planned maintenance of the III-V ICP it is implemented on equal terms as the other ICP's and RIE machines and we would be happy to share this information with people who are interested.xxx


Comment 8

Furnace: LPCVD Nitrid has been out of use for a long time. This has slowed me in my work on my BSc project. Also the PECVD1 had missing B2H6 MFC, which also was an obstacle for me. The SSE Spinner is always booked, because everyone needs to use it - Danchip should consider to buy one more Spinner.

Action: We assume that the comment is on the LPCVD Nitride(6"). We have had severe problems with condensation of DCS in the line which a.o. destroyed the mfc and in the end resulted in a severe particle contamination of the furnace. The repair work has been delayed partly due to long delivery times on spare parts. In such a case where we must foresee a long down time we normally would try to find an alternative in-house solution or assist on finding an external source. I do not know if the user in the present case was made aware of this. Regarding the B2H6 problem on PECVD1 the issue seems to be decoposition of the gas resulting in a "sticky" layer deposited on the inside of the tube and other components on the gas line (pressure gauge/regulator, mfc). Again the problem/solution has been very complex and a.o. implied waiting times for spare parts. As part of the problem was in the gas supply it was not possible to find an in-house alternative and the only external supplier that we could find had similar problems and was not able to help. Regarding spinner capacity a double-track spinner system from SVG is being installed now.xxx


Comment 9

Recurrent booking option is needed in labmanager, and maybe an implemention of a function where users can write if they finishes early with their booking instead of having to check who has the next booking, and having to e-mail them.

Action: xxx


Comment 10

Availability of equipment answer is only "satisfied" due to sometimes a crucial machine such as EVG NIL being offline for an extended period.

Action: xxx


Comment 11

Again Danchip has live up to my high expectations. Whenever a problem is discoverede there are clear lines of communication to start the process of solving the problem.If there was one thing I criticize it would be the availability of training, especially for students. For various reasons Danchip was under-staffed the last time students started in the cleanroom, this significantly set back a very short project. However, I got the impression that Danchip was aware of the issue and was trying to solve the problem. That was an example of good communication in regretful situation.

Action: No action

Hopefully the issue is resolved now.


Comment 12

Det kunne være rart med et bedre mail-udbredningssystem. Lige nu ryger alle mails der har noget som helst med renrummet at gøre ud til samme mailing-liste, hvilket gør, at man ikke får læst dem (99% består af "6-inch aligner er klar til næste bruger" eller noget lignende) Hvis man i stedet havde flere lister, så man kunne sortere uvæsentlige beskeder fra, og stadig få tilsendt de vigtige (såsom "der er strømafbrudelse/brandøvelse/etc næste mandag fra 12-13") kunne det være lækkert. Evt også lave lister for de forskellige maskiner, så jeg kunne få tilsendt opdateringer vedrørende KS-aligner (den bruger jeg), men ikke DUV-stepperen (den bruger jeg ikke), så ville det være helt perfekt.

Action: xxx


Comment 13

Sometimes people need to wait a little bit longer time for those machines which are not commonly used to be fixed. But generally the cleanroom and all the staff are very helpful.

Action: xxx


Comment 14

Sometimes i feel irritated when some user use the machine like RIE and does not run a cleaning recipe after that.Same is with PECVD3. when someone does the deposition and it crosses the limit of 6µm deposition; he or she should run etchback and stdpredep recipe too. It often takes 30 to 40 minutes of my time especially if i have to do 15 minutes of deposition at the end of the day.

Action: xxx


Comment 15

Only drawback is equipment downtime

Action: xxx


Comment 16

It would be nice if new equipment was presented more detailed. Sometimes this happens with a mail or so, but often there is something new standing in the cleanroom and I have to find out by myself what it can do and how it compares to the other equipment.

Action: xxx


Comment 17

Issues with the stability of the pyrolysis oven are giving us unreproducible results. Staff just left us with the comment that it is an old oven and nothing can be done, which is not a satisfying and customer-oriented answer a machine that costs 1000 DKK/hour.

Action: xxx


Comment 18

Availability: SEM-Zeiss is always been booked by someone for many times in one day and more than ten times in one week. Sometimes III-V aligner, III-V ICP are down for long time.

Action: xxx


Comment 19

Danchip should decide what format they want to work on. It is very annoying that some equipment (DUV stepper) in principle only handles 6 inch wafers whereas all etching tools are running 4 inch mode...why not put all etchers on 6 inch as default and then people must use carriers when they want to process 4 inch wafer? Or if they have delicate processes on 4 inch they can ask to get the tool set to 4 inch but they should rund 6 inch at all time as default.

Action: xxx


Comment 20

You should be more aware of getting work carried out on the DUV stepper done correctly according to the customer's instructions.

Action: xxx


Comment 21

SSE spinner has many problems so it often delays processes

Action: xxx



Comment 22

Danchip should time maintanence of equipment better so e.g. it fits into the periods where the cleanroom is closed instead of having service on some equipment the week before the cleanroom is closed causing the down town to be 2 weeks in reality for the customer.

Action: xxx


Comment 23

The model you are using with having teams that are responsible for equipment works poorly since all members of the teams can blaim each other when things are not working as they should. It was better in the old days with 1-2 dedicated persons on each tool. This way there could not be bad excuses for tools not working.

Action: No action

from the Danchip management perspective, the team approach is the right way for Danchip to operate. We highly value the strength of teams to assure a minimum level of competance on tools even in times of vacation or illness. We do not see the teams working perfectly, so we are always looking for ways to improve.

Comment 24

It could be great with more focus on particle contamination of wafers in Danchips cleanroom - expecially it could be nice to have a particle scanner so one could identify and throw out wafers after spin coating which is the worst cause of defects on wafers in your cleanroom.

Action: xxx


Comment 25

Any progress on getting the paricle issues with the MVD tool solved?.

Action: xxx


Comment 26

ICP metal ætseren har været meget nede, samt cluster 1 tidligere på året, som er gået ud over både projekter samt kundeopgaver... Lukning af renrummet (og andre meget vigtige informationer) skal ikke foregå via spam email, men skal også puttes på labmanager...

Action: xxx